Playaderna

Design-Build Playground with the Participatory Design Method

Design-build playground in Gothenburg, Sweden

Collaborators
Klara Sjögren-Holtz, Susanne Sibinska Taieb, Efstathia Douli, Ivana Milicevic, & Zoë Van der Pas (students) Colectivo Warehouse; Chalmers University of Technology; Mosaikfabriken; Utetjänst

Client
Hyresgästföreningen, Familjebostäder & Göteborgs Stad

Year
Fall 2017

What -

A new playground for the Bergsjön neighborhood, an under-serviced area located on the outskirts of Gothenburg, was requested by the local community. As part of Chalmers Architecture’s Design for Social Inclusion course, Taleen was one of 6 students that helped design and build a playground born out of the local childrens’ imaginations in the Fall of 2017.

In order to ensure community support and involvement in the project, participatory design methods were employed to drive the outcome of the project through a series of events and workshops.

Final Design -

The final design was inspired by the area’s space theme; all of the main landmarks and streets are named after elements found in space.

The play structure is meant to resemble a crashed meteor. The play structure intentionally lacks clear functions (beside the climbing grips installed throughout the surface) to leave space for the children to inform their own types of play.

Objective -

To encourage the younger inhabitants to become active in the development of the area, to provide a space for local kids ages 7-13, & to create a site specific design that connects to the history of the area and strengthens the sense of place.

The Participatory Design & Building Process in Images

Brainstorming meet & greet with the neighborhood children

We used model making as a way for the children to visualize, discuss, and present their playground desires

Based on the kids’ input, the design team interpreted a design for the playground with the help of design-build firm, Colectivo Warehouse, and a playground safety consultant.

Playground design concept illustration

Design concept illustration

Construction took place November 2017

The opening party in December 2017

… 6 months later in June 2018